This project consisted of constructing a new building to house generator and paralleling switchgear equipment which supply backup electrical power for MasterCard functions housed in an adjacent building. A new separate fuel pump room building was also constructed for the purpose of delivering fuel to the new generator building from the existing bulk fuel storage tanks.
The building was constructed to resist wind loads up to 208mph.