Dual Flow Conversion

Cooper Nuclear Station
Brownsville, Nebraska

Nebraska Public Power District
John Humphrey
P.O. Box 499
Columbus, Nebraska 68602
P: (402) 910-0554 F: (402) 563-5703

Completed: January 2006

Scope of Work: This project consisted of the design, manufacture and delivery of nine (9) Dual Flow Traveling Fish Screens to Cooper Nuclear Station. These screens were the first traveling screens designed to both minimize the owner's downtime, and also have the ability to minimize damage to both juvenile and adult fish. These were the first dual flow fish screens installed on the Missouri River.