Cooling Tower Piping System
CertainTeed Corporation
Kansas City, Kansas
CertainTeed Corporation
Paul Saylor
PO Box 1100
Blue Bell, Pennsylvania 19422
P: (610) 341-6309 F: (610) 341-6773
Completed: October 2004
Scope of Work: This project included the installation of a cooling tower piping system consisting of two (2) 75hp pumps and filtration system. As the Mechanical Prime Contractor, Rand reconfigured the chemical feed system and tied the pumps into plant controls. This project was completed during a two-week plant shutdown.