Completed: October 2004

Scope of Work: This project included the installation of a cooling tower piping system consisting of two (2) 75hp pumps and filtration system. As the Mechanical Prime Contractor, Rand reconfigured the chemical feed system and tied the pumps into plant controls. This project was completed during a two-week plant shutdown.