This project consisted of the installing an 80' set-back security perimeter. The perimeter was compiled of 8-12 ton boulders, and a cable beam barrier manufactured by B&Armor. At the emergency fire entrances, manual bollards were positioned for access by fire trucks. |
|
 |
The project scope consisted of the installation of a 750 kW backup emergency generator and its associated switchgear for a call center that operates 7 days a week. Due to city codes, the generator required an enclosure. The enclosure at just 15'- 4" in height, was constructed of split face block anchored to a cast-in-place concrete stem wall and spread footing. |
|
 |
The project scope was the conversion of HVAC and exhaust equipment associated with a confidential process room that operates 7 x 24. For the HVAC conversion, two existing 60 ton roof top units were replaced with a York 150 ton air cooled chiller and make up air handler designed for the supply of 100% outside air. |
|
 |
The project consisted of constructing a new 2,000 ton, four cell, stand alone, reinforced concrete structural cooling tower with Marley cooling tower components. The Marley components consisted of the pumps, fans, fill and spray system. |
|
 |
This project consists of designing and constructing a custom, self-contained power distribution vault. A
total of 10 custom vaults distribute utility, generated and UPS power to equipment over a 250 acre site. |
|
 |
The project consisted of installing a second perimeter fence and road along the 3,500 foot property line. The installation included security upgrades, such as new light poles every 100 feet around the perimeter, placing of security conduit for cameral installation and fence detection around the full perimeter of the new road and fence. |
|
 |
Project included installation of a self-contained caterpillar diesel engine generator to power a business critical bus. |
|
 |
This project consists of design, construction and commissioning of generator controls for an existing datacenter. The existing control system was an emergency isolated bus paralleling system with open transition from the utility upon an outage. |
|
 |
The scope of this project was the renovation of a functioning data center's energy center. It replaced a fifteen year old single UPS distribution design with a state of the art dual UPS (A-B) distribution design. |
|
 |
Phase 1 consisted of building out infrastructure for support of the first data floor, at 50 watts per square foot, for the hosting business. The web hosting facility was located on the fourth floor of a historical building near the Los Angeles downtown area. |
|
 |
These projects consisted of design and construction administration of cell sites for cellular transmission in and around the Kansas City Metro area. |
|
 |
New Jersey... Construction Management services for this project consisted of site supervision, and project tracking for general construction installations.
St. Louis... Construction Management Services for this project consisted of Project Management and project tracking for modifications to a new Disaster Recovery Center. |
|
 |
The project consisted of demolition of an existing electric heated sidewalk and replacement with the same, using the Nelson Heat Tracing System. |
|